Switch stack failover in New York (NYC1)
- Affected:
- Network · NYC1, VPS hosts · NYC1, Dedicated servers · NYC1
- Duration
- 27 min
- Reference
inc-20240817-1
Timeline
- Resolved
Resolved. The stack is back to full redundancy. Total customer-visible impact: a 4 to 8 second connectivity gap on one rack.
- Monitoring
The power supply has been replaced from the on-site spare pool and the stack is re-forming.
- Identified
The primary switch member has a failed power supply. Servers are running on the peer at full bandwidth.
- Investigating
A top-of-rack switch in New York (NYC1) failed over to its stack peer. Affected servers lost connectivity for a few seconds.
Were you affected? Open a ticket within 7 days and we credit your balance under the SLA.