Switch stack failover in Frankfurt (FRA1)

Degraded performance Resolved · 23 Jul 2025, 07:53 UTC → 23 Jul 2025, 09:58 UTC · 2 h 05

Affected:
Network · FRA1, VPS hosts · FRA1, Dedicated servers · FRA1
Duration
2 h 05
Reference
inc-20250723-1

Timeline

  1. Resolved

    Resolved. The stack is back to full redundancy. Total customer-visible impact: a 4 to 8 second connectivity gap on one rack.

  2. Monitoring

    The power supply has been replaced from the on-site spare pool and the stack is re-forming.

  3. Identified

    The primary switch member has a failed power supply. Servers are running on the peer at full bandwidth.

  4. Investigating

    A top-of-rack switch in Frankfurt (FRA1) failed over to its stack peer. Affected servers lost connectivity for a few seconds.