All systems operational
Support
EN
Language

More languages are on the way.

Switch stack failover in New York (NYC1)

Degraded performance Resolved · 10 Mar 2026, 16:57 UTC → 10 Mar 2026, 17:27 UTC · 30 min

Affected:
Network · NYC1, VPS hosts · NYC1, Dedicated servers · NYC1
Duration
30 min
Reference
inc-20260310-1

Timeline

  1. Resolved

    Resolved. The stack is back to full redundancy. Total customer-visible impact: a 4 to 8 second connectivity gap on one rack.

  2. Monitoring

    The power supply has been replaced from the on-site spare pool and the stack is re-forming.

  3. Identified

    The primary switch member has a failed power supply. Servers are running on the peer at full bandwidth.

  4. Investigating

    A top-of-rack switch in New York (NYC1) failed over to its stack peer. Affected servers lost connectivity for a few seconds.

Were you affected? Open a ticket within 7 days and we credit your balance under the SLA.